Description
This Safety Pack for Plumbers provides clear policies and procedures as well as step by step compliance procedures in the SWMS to ensure Work Health and Safety obligations are being met on site. All common high risk construction work (HRCW) hazards and risk controls have been included in the SWMS.
If you require further information about any of the documents included in the Plumbers Safety Pack please call 1300 504 899.
When you become a member – YOU SAVE OVER 40% WHEN YOU BUY THIS SAFETY PACK
List of content included in the Plumbers Safety Pack
- A site safety plan which covers your WHS policies and procedures on site
- A fillable PDF to include project details and scope of works
- Details roles and responsibilities, WHS Duties, Training, Incident management and much more.
- Includes specific sections on Working at Heights, Hot Works and Excavation works
- Forms, registers and checklists needed for site including JSA, Risk Assessment, and more.
- The SWMS have been selected to assist you achieve on site plumbing compliance on a daily basis.
Here is a list of SWMS included in the pack
- Working near powerlines and utility services
- EWP- Operating elevating work platform
- Sewer pipe installation – Residential
- Stormwater pipe installation – Residential
- Water pipe installation – Residential
- Hot Works
- Install roof plumbing pipework and flashings
- Plumbing Rough-in work
- General plumbing and maintenance work
- Ladders including platform ladders (safe use)
- Roof (metal) and gutter installation
- Gas pipe and services installation
It also includes:
- A fillable PDF information page is provided where you can add site and task specific details to the SWMS
- Safe Work Method Statement (SWMS) instructions so that workers can easily follow them to revise the SWMS onsite if required.
- Risk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite
- Job/Task Steps – logical and easy to follow step by step job processes are listed throughout the SWMS
- Potential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)
- HRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.
- Risk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively
- Facility for entering the position/name of the person responsible for monitoring risk controls & reviewing SWMS is provided
- Risk assessment risk level for each hazard with residual/post control risk level noted (to be reviewed onsite)
- Worker and public safety procedures are added as required
- Heat stress and Ultra violet exposure safe work procedures are added when applicable
- Personal protective equipment (PPE)
- Qualifications, Training, and Duties required to achieve and maintain health and safety compliance
- Induction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite
- Methods of monitoring risk controls are included in this SWMS
- Process for reviewing the risk control measures are provided in this SWMS
- Review date record facility is provided – to be recorded at your pre-start or toolbox meetings
- Document control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients
Additional benefits you receive when purchasing the Plumbers Safety Pack
Our documents are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business.
We diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing our products.
Our forms are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the documents on a mobile device (if your device has the required features or Apps installed).
Printable PDF – you can print of as many copies as often as you like and keep it looking professional.
Promote your business – our documents allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.
Simple and easy to use while giving your WHS documents a professional look!
Our documents are developed using a fillable PDF format to make sure they are quick and easy to fill out. This means your documents will keep looking professional when opened on any computer or mobile devise. To prepare for site, you need to fill out the site-specific details for each project on the front page, induct your workers into the SWMS and get them to sign off and date before starting work.
Because we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.
Important Safety Note:
Under current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.
Contact us to request customised compliance documents
Construction Safety is dedicated to helping alleviate the stress of achieving continuous workplace health and safety compliance. To request customised documentation, simply fill in the Contact Us form on our contact page.